Producción CyT
An MILP framework for batch reactive scheduling with limited discrete resources

Artículo

Autoría
C.A. Méndez ; J. Cerdá
Fecha
2004
Editorial y Lugar de Edición
Elsevier
Revista
COMPUTERS AND CHEMICAL ENGINEERING, vol. 30 (pp. 913-946) Elsevier
Resumen Información suministrada por el agente en SIGEVA
Dealing with limited discrete resources in batch scheduling problems usually produce a sharp increase in the model size and computational requirements. This work introduces a novel continuous-time MILP formulation where all discrete resources including processing units are treated uniformly. Moreover, the ordering of batches at any processing unit or resource item is handled by a common set of sequencing variables so as to achieve an important saving in 0-1 variables. Pre-ordering rules signifi... Dealing with limited discrete resources in batch scheduling problems usually produce a sharp increase in the model size and computational requirements. This work introduces a novel continuous-time MILP formulation where all discrete resources including processing units are treated uniformly. Moreover, the ordering of batches at any processing unit or resource item is handled by a common set of sequencing variables so as to achieve an important saving in 0-1 variables. Pre-ordering rules significantly reducing the problem size can be easily embedded in the MILP framework. In addition, discrete resources may be sequentially assigned when real world scheduling problems are tackled. Two examples involving the scheduling of up to 29 batches in a single-stage batch plant with limited manpower were successfully solved. Comparison with prior work shows a notable reduction in the CPU time of at least two orders of magnitude.
Ver más Ver menos
Palabras Clave
Reactive schedulingReactive schedulingMILP modelDiscrete resources